Installed and graded topsoil in rear yards.
·
Performed clean-up of excess materials in ditch
line
·
Extended culverts in area with steep ditch lines
·
Installation of inlets within ditch lines
·
Made spot repairs within existing storm sewer
system.
Work Anticipated to be Performed, July 24th to
July 28th
·
Complete needed storm repairs within existing
system that were identified during televising inspection.
·
Begin roadway improvements.
There have been several unforeseen delays over the past
weeks, including inclement weather and threat for heavy rains. Please be
assured the Village and contractor are committed to completing the work as
quickly as possible.
Thanks again for all your
patience and understanding during these delays.